CEVA

Geneva
Category
Facades, Steel structure
Tags
IMPA Global Awards, sheet metal, steel structure, VEC
About This Project

 

Project

Rail link CEVA (Cornavin – Eaux-Vives – Annemasse)

– Lancy-Pont Rouge Station – Eaux-Vives Station 

– Carouge Bachet – Chêne-Bourg Station 

– Champel Hôpital Station

 

Work description

5 stations 

Steel structure made of steel welded sections with a fixed width of 120 mm and a variable height of 300 to 3’300 mm (~3’615 to). 

920 glass block modules with SGG glass (5.4 x 2.7 metres) for the façadefloor and roof with monolithic low-iron “CEVA” glass (~27’000 m2). 

Works carried out in consortium. 

Distinction :  

IMPA Global Awards 2020 –Megaprojets category – 3rd rank 

 

Completion

2016 – 2017

 

Clients

CFF SA – Projet Ceva Etat de Genève (DIME)

 

Architects

Groupement Ateliers Jean Nouvel – EMA Architectes

 

Engineer

Ingphi SA