bridge Tag

  • All
  • News
  • Press
  • Sottas News
  • Uncategorized

176 metres long and weighing 608 tonnes, it was divided into five sections, each made up of several segments manufactured in our workshops in Bulle and assembled on site. This new soft mobility footbridge, 🚴♀️ 🚶♂️ whose deck is made up of two lateral metal caissons...

During the night of 7 to 8 December, the 4th section of the Grand-Pont in La Chaux-de-Fonds was lifted into place over the SBB tracks. 🚆 👊 The 35-metre-long element, weighing 200 tonnes, was assembled and welded on the ground, then lifted into place in one...

Special night for one of our assembly team!     Mounting of a one-piece metal bridge weighing 40 tons to replace the old bridge at Glérolles Castle.   Discover our film CFF SBB Pont du château de Glérolles St-Saphorin   Thank you to all participants of the Glérolles Bridge in St- Saphorin,...