Author: admin

  • All
  • News
  • Press
  • Sottas News
  • Uncategorized

The removel of steel shoring props beneath the Colovrex Bridge took place during the night of Wednesday, October 29th, 2021. Here you can see the new bridge with a span of 55 meters above the motorway for the Grand-Saconnex Motorway Junction (JAG). ...

Let’s go and dive into the new school of metal designers/constructors   The inauguration took place on Thursday, 4th November 2021. Sixteen motivated young people embarked on this adventure and we will follow their outstanding achievements throughout their careers. We wish everyone a good school start! For further information please...

20 October 2016, Sottas SA receives a Mention for the project: Place de la Gare de La Chaux-de-Fonds.  This project consisted of the redevelopment of a public space and the construction of a bus station and a covered multi-purpose area.  Some figures: 21,000 m2 of redeveloped surface, 1,944 m2 of covered surface...

Sottas SA received the award for the “Best Training Company 2021” in the category “Technology and Mechanics”. This distinction was handed over by the Employers’ Association of Fribourg. Alexandre Oberson, “Best apprentice in the canton of Fribourg in 2021”, brilliantly obtained his CFC as a metalworker. Year...

A unique moment for SOTTAS SA who won two of six prizes at the Facade Award « PrixForix 2021 ». The winner of the Audience Award is the new Scott Sports’ headquarters in Givisiez. An original and lively building thanks to movements and exceptionnel effects generated by those...

Sottas SA on the second step of the podium ! Once again this year, the journal « Bilan » named our company as Best Employer in the Design and Construction category. The activity of our company is in the field of metal construction. The management is honoured by this ranking...

New branch from the school start in 2021 In March 2021, Metaltec Romandie and Ecole de Métal founded the Ecole romande du Métal Sàrl to train future designers / draughtsmen on metal in the French speaking part of Switzerland. The aim therefore is to strenghten the...

The first metal beams for the new Valascia ice rink left our workshops and have been delivered on time! Here you can already marvel at the first installed metal beam! ...

Ready, steady, go !  Imposing metal structural parts have left our workshops for the new “Centre multisports H2O Malley” in Prilly.  This complex includes a 10,000-seat ice rink, an Olympic swimming pool, fencing halls, an auditorium and a parking, among others.  The skating rink “Vaudoise Aréna” was inaugurated on September 24th, 2019. As for the infrastructures where among others the swimming pools are located, they will be operational at the beginning of 2021.    Client Centre Sportif de Malley SA Main Contractor Steiner SA Architect Pont 12 Architectes SA Engineer EDMS SA ...