Archive

Sierre
  • All
  • Events
  • News
  • Press
  • Private events
  • Sottas News
  • Sports events
  • Uncategorized

  Project New business high school and gymnastics hall   Work description Stick system facade including 124 openings and 14 aluminium doors.   Mirror-polished stainless steel cladding.   Exterior venetian blinds and "zip" fabric blinds (~3'300 m2).   External maintenance catwalk.   Total surface area : ~8'250 m2   Completion 2017-2019   Client Etat du Valais - DTEE-SBMA   Architect Bonnard Woeffray SA   Engineer Kurmann & Cretton SA   Facade consultant Arteco SA...

  Project New administrative building   Work description Unitised curtain wall façade, double-skin façade, with V structurally bonded glazed screen.   South facade: fixed glazing.   Skylight in Sottas 56 stick system with steel structure.   Entrance: Sottas 50 aluminium stick system.   Ventilated facade  on superstructure Entrance gate. Automatic door.   External and internal soffits in corrugated metal sheet.   Exterior venetian blinds. Total surface area : ~2'150 m2   Completion 2017 - 2018   Client Rhodanie Investment AG   Architect Richter Dahl Rocha & Associés architectes SA   Facade consultant Arteco SA...

  Project Refurbishment and extension of the clinic   Work description Aluminium stick system curtain wall with Sottas 50 system installed in reversed position, over a height of 7.7 metres and a width of 45.0 metres for swimming pool, stairwell and fitness room enclosures.  Steel stick system curtain wall with structural glazing, 90 x 90 mm solid sections...

  [video width="848" height="480" mp4="https://www.sottas.ch/wp-content/uploads/2018/11/Sottas-façade-Immeuble-Rhône-30-Genève-vidéo.mp4"][/video]   Project Renovation of an administration and commercial building during operation    Work description Facade renovation (~1’700 m2) with aluminium window units, triple insulated glass (with a triangular structure to extend the area).  Exterior venetian blinds with flat slates.  Double skin facade with structurally bonded glazed screen with ceramic fritting and LED lighting.     Completion 2014 (1st step) - 2015 (2nd step) 2016 (3rd step) - 2018 (4th step)   Client Fondation Barbour   Site management SPG Asset Development   Architect Fabio Fossati Architectes SA   Facade consultant BCS SA...

  Project Refurbishment of an administrative building from the 70’s (1973)    Work description Unitised curtain wall aluminium façade (583 units).   Aluminium stick system façade.   Spandrel cladding with Braille-like perforation pattern and LED backlighting.   Ventilated facade with 3 mm aluminium sheet and visible fixing.   Exterior venetian blinds and ZIP fabric blinds.   Automatic door.   Completion 2017   Client Helvetia Projet Immobiliers Suisse   Main contractor HRS Real Estate SA   Architect Vernet Hogge Architectes   Facade consultant Biff SA...

  Project Renovation of an administration and commercial building during operation    Work description Street side: EI30 aluminium glazed facade elements with structurally glazed faceted double-skin. Exterior steel walkways.   Courtyard side: Aluminium glazed facade elements.   Attic: Window elements and anodised aluminium cladding.   Awning: Aluminium cladding.   Total surface area: ~8'200 m2    Completion 2016 - 2017   Clients - Régie BEFI SA - Fondation Patrimoine Immobilière   Architects - Brodbeck-Roulet SA -...

  Project New production facility  01   Work description Unitised curtain wall with burglar resistance (RC2, RC3 and RC4) (~3’760 m2)  – Standard : ~2’250 m2  – RC 2 + RC 2 cladding: ~660 m2 + ~20 m2  – RC 3 + RC 3 cladding: ~670 m2 + ~80 m2  – RC 4 : ~80 m2  7 nos. stainless steel doors with EI30 and RC3 or RC4 resistance.   2-storey high pedestrian footbridge linking the existing building, dimensions 7 x 9 metres.  49 nos. RC3 and EI30 window units  Entrance overhanging eaves.  Staircase...

  Project Renovation and extension of the high school   Work description Closed Cavity Facade (~2’240 m2)   Completion 2016   Client Municipality of Horw   Site management a4 architekten GmbH   Architect ARGE Lussi + Halter   Facade consultant GKP Fassadentechnik AG...

  Project Rail link CEVA (Cornavin - Eaux-Vives - Annemasse) – Lancy-Pont Rouge Station – Eaux-Vives Station  – Carouge Bachet – Chêne-Bourg Station  – Champel Hôpital Station   Work description 5 stations  Steel structure made of steel welded sections with a fixed width of 120 mm and a variable height of 300 to 3’300 mm (~3’615 to).  920 glass block modules with SGG glass (5.4 x 2.7 metres) for the façade, floor and roof with monolithic low-iron “CEVA” glass (~27’000 m2).  Works carried out in consortium.   Distinction:   IMPA...

  Project Renovation   Work description Window profiles with insulated glass (~2'000 m2).   Stick system with insulated glass (~560 m2).   Precast concrete placed in front of the insulated façade.   Automatic double sliding doors.    Completion 2016   Client Crédit Suisse AG Corporate Real Estate and Services, TLSW   Main contractor Implenia Suisse SA Buildings Ouest   Architect Burckhardt + Partner SA   Facade consultant BTM Sàrl...