  Project New soft mobility footbridge over the A1 linking Renens station to the university campus and the lake   Work description Welded composite steel structure with a central section between supports of 35 m. The structural system consists of a single box. Execution class EXC3. Night-time assembly. Lenght of deck:...

  Project New pedestrian bridge over the SBB tracks in Renens station   Work Description Load-bearing metal structure composed of triangulated beams, assembled in 4 sections. Length : ~120.0 m Variable width : ~10.0 à 16.0 m Clearance height : ~3.5 à 5.5 m Execution class EXC3. Partial night assembly. ~350 to   Completion 2019 - 2020   Client Communes de...

  Project 3 new bridges and a temporary bridge for the motorway junction   Work description Bridge 1: PS JCT du Grand-Saconnex - cable-stayed bridge - Orthotropic steel deck (~1'000 tons) - Double central cable-stayed deck - Span: 80.0 m / Width: 27.4 m / Height: 37.0 m (mast) Video OFROU Bridge 2: PS de...

  Project Refurbishment of Station – Soft Mobility Footbridge   Work description Steel structure with welded profiles   Length: ~190.00 m  Overall width: ~6.35 m  Execution class EXC3.  Steel guard rail  Partially installed at night  ~420 tons    The soft mobility footbridge of the Givisiez station was awarded the PRIX VELO Instrastructure prize 2020.  More information is available at the following link www.pro-velo.ch   Completion 2019   Client CFF SA - Infrastructure - I-PJ-MP-LS-PJM2 Lausanne   Engineers Groupement DMEB - DMA Ingénieurs SA -...

  Project New railway bridge   Work description Single span, two-beam composite steel and concrete bridge   Steel structure with welded profiles   Galvanizing and 3-coat paint protection  Length: ~30 linear metres   Overall width: ~3.75 m  Height of main beams: ~2.20 m  Weight: ~43 tons  Execution class: EXC4    Client CFF SA - Infrastructure – Pont et structures   Main contractor JPF SA   Engineer  GVH Tramelan SA...

  Project Demolition of existing bridge and construction of a new bridge    Work description In consortium: Sottas SA leading – Walo Bertschinger SA  Structure composed of three-dimensional metallic truss (made up of circular hollow section) and of reinforced concrete trough, slipping of structure up to its final location.   Execution class EXC4   (~100 tons)  Length: ~48.0 metres  Width:     ~6.0 metres  Height:    ~4.5 metres     Completion 2018   Client Compagnie du Chemin...