Archive

Geneva
  • All
  • Events
  • News
  • Press
  • Private events
  • Sottas News
  • Sports events
  • Uncategorized

  Project 3 new bridges and a temporary bridge for the motorway junction   Work description Bridge 1: PS JCT du Grand-Saconnex - cable-stayed bridge - Orthotropic steel deck (~1'000 tons) - Double central cable-stayed deck - Span: 80.0 m / Width: 27.4 m / Height: 37.0 m (mast) Video OFROU Bridge 2: PS de...

  Project New railway bridge   Work description Single span, two-beam composite steel and concrete bridge   Steel structure with welded profiles   Galvanizing and 3-coat paint protection  Length: ~30 linear metres   Overall width: ~3.75 m  Height of main beams: ~2.20 m  Weight: ~43 tons  Execution class: EXC4    Client CFF SA - Infrastructure – Pont et structures   Main contractor JPF SA   Engineer  GVH Tramelan SA...