Archive

Prilly
  • All
  • Events
  • News
  • Press
  • Private events
  • Sottas News
  • Sports events
  • Uncategorized

  Project 14-storey building on top of the Malley-Lumière shopping centre (the 1st habitable tower in timber structure in French-speaking Switzerland)   Work description Steel structure made up of 3 lattice trusses on 3 levels (9 storeys), with a span of 46 metres. Bracing structure up to the roof on 3...

  Project Demolition of existing bridge and construction of a new bridge    Work description In consortium: Sottas SA leading – Walo Bertschinger SA  Structure composed of three-dimensional metallic truss (made up of circular hollow section) and of reinforced concrete trough, slipping of structure up to its final location.   Execution class EXC4   (~100 tons)  Length: ~48.0 metres  Width:     ~6.0 metres  Height:    ~4.5 metres     Completion 2018   Client Compagnie du Chemin...