Archive

Sierre
  • All
  • Events
  • News
  • Press
  • Private events
  • Sottas News
  • Sports events
  • Uncategorized

  Project New business high school and gymnastics hall   Work description Stick system facade including 124 openings and 14 aluminium doors.   Mirror-polished stainless steel cladding.   Exterior venetian blinds and "zip" fabric blinds (~3'300 m2).   External maintenance catwalk.   Total surface area : ~8'250 m2   Completion 2017-2019   Client Etat du Valais - DTEE-SBMA   Architect Bonnard Woeffray SA   Engineer Kurmann & Cretton SA   Facade consultant Arteco SA...

  Project New administrative building   Work description Unitised curtain wall façade, double-skin façade, with V structurally bonded glazed screen.   South facade: fixed glazing.   Skylight in Sottas 56 stick system with steel structure.   Entrance: Sottas 50 aluminium stick system.   Ventilated facade  on superstructure Entrance gate. Automatic door.   External and internal soffits in corrugated metal sheet.   Exterior venetian blinds. Total surface area : ~2'150 m2   Completion 2017 - 2018   Client Rhodanie Investment AG   Architect Richter Dahl Rocha & Associés architectes SA   Facade consultant Arteco SA...

  Project Extension and conversion of an industrial building into a retirement home   Work description Façade made of brushed and riveted aluminium composite panels. Unitised double-skin facade in aluminium with structurally bonded glass to the outer skin. Glass balustrades to loggias. Atrium linking ground floor to first floor: motorised sliding glass doors...

  Project New railway bridge   Work description Single span, two-beam composite steel and concrete bridge   Steel structure with welded profiles   Galvanizing and 3-coat paint protection  Length: ~30 linear metres   Overall width: ~3.75 m  Height of main beams: ~2.20 m  Weight: ~43 tons  Execution class: EXC4    Client CFF SA - Infrastructure – Pont et structures   Main contractor JPF SA   Engineer  GVH Tramelan SA...

  Project Temporary arena    Work description Steel structure of arena featuring 4 nos. monumental masts and a platform over the lake. (~1’200 tons)   Completion 2019   Client Confrérie des Vignerons   Architect Compagnie Finzi Pasca   Engineer Daniel Willi SA   RTS : wednesday March 20, 2019 Couleurs Locales : friday February 8, 2019...

  Project Construction of new IOC Headquarters   Work description Monumental staircases:  Construction of the supporting structure of ring-shaped staircases serving a total of 6 levels. Execution in welded composite boxes of constant width (1.50 m) with variable height (from 350 to 750 mm). External radius 12.80 m (ground floor) and 10.80...

  Project Refurbishment and extension of the clinic   Work description Aluminium stick system curtain wall with Sottas 50 system installed in reversed position, over a height of 7.7 metres and a width of 45.0 metres for swimming pool, stairwell and fitness room enclosures.  Steel stick system curtain wall with structural glazing, 90 x 90 mm solid sections...

  [video width="848" height="480" mp4="https://www.sottas.ch/wp-content/uploads/2018/11/Sottas-façade-Immeuble-Rhône-30-Genève-vidéo.mp4"][/video]   Project Renovation of an administration and commercial building during operation    Work description Facade renovation (~1’700 m2) with aluminium window units, triple insulated glass (with a triangular structure to extend the area).  Exterior venetian blinds with flat slates.  Double skin facade with structurally bonded glazed screen with ceramic fritting and LED lighting.     Completion 2014 (1st step) - 2015 (2nd step) 2016 (3rd step) - 2018 (4th step)   Client Fondation Barbour   Site management SPG Asset Development   Architect Fabio Fossati Architectes SA   Facade consultant BCS SA...

  Project Demolition of existing bridge and construction of a new bridge    Work description In consortium: Sottas SA leading – Walo Bertschinger SA  Structure composed of three-dimensional metallic truss (made up of circular hollow section) and of reinforced concrete trough, slipping of structure up to its final location.   Execution class EXC4   (~100 tons)  Length: ~48.0 metres  Width:     ~6.0 metres  Height:    ~4.5 metres     Completion 2018   Client Compagnie du Chemin...

  Project Refurbishment of an administrative building from the 70’s (1973)    Work description Unitised curtain wall aluminium façade (583 units).   Aluminium stick system façade.   Spandrel cladding with Braille-like perforation pattern and LED backlighting.   Ventilated facade with 3 mm aluminium sheet and visible fixing.   Exterior venetian blinds and ZIP fabric blinds.   Automatic door.   Completion 2017   Client Helvetia Projet Immobiliers Suisse   Main contractor HRS Real Estate SA   Architect Vernet Hogge Architectes   Facade consultant Biff SA...