Archive

Le Grand-Saconnex
  • All
  • News
  • Press
  • Sottas News
  • Uncategorized

  Project 2 new buildings (administrative + residential)   Work description Building KYOTO : Facade with aluminium unitised curtain wall. Aluminium stick system curtain wall for entrance airlock. Aluminium external venetian blinds. Total surface area of the facades: ~4’920 m2 Building MONTREAL : Wood/metal facade with metal cladding in anodized aluminium sheet. Ground floor in aluminium stick...

  Project Transformation and renovation of the administration building   Work description Corridors and stairs for emergency exits in hot-galvanized metal structure, including floor with elastomastic. Installation in dense city Environnement (~125 to). Removal of 842 existing glazing. Aluminum windows. EI30 glazing. Sottas 50 aluminium stick system curtain wall. Structurally glazed screen in front...

  Project Renovation of the tower (55 metres)   Work description Main façades: Aluminium unitised facade (630 units) with electrochromic glass. Insulating spandrel integrating the bracketing and providing the fire-stop function at the slab edge. External aluminium fins 1’100 lm (new profile). External aluminium window sills 900 lm (new profile)....

  Project Rehabilitation and renovation of the industrial building   Work description Removal of old glazing. 203 aluminium glazing. 182 steel windows, one of which is in the shape of a clock. 7 Sottas 56 steel canopies. 3 steel stairwells. Steel glazing on the 2 roof awnings. 18 steel doors, automatic sliding doors at entrance and sectional...

  Project 14-storey building on top of the Malley-Lumière shopping centre (the 1st habitable tower in timber structure in French-speaking Switzerland)   Work description Steel structure made up of 3 lattice trusses on 3 levels (9 storeys), with a span of 46 metres. Bracing structure up to the roof on 3...

  Project New soft mobility footbridge over the A1 linking Renens station to the university campus and the lake   Work description Welded composite steel structure with a central section between supports of 35 m. The structural system consists of a single box. Execution class EXC3. Night-time assembly. Lenght of deck:...

  Project New school building (18 classrooms, double gym and APEMS schoolchildren’s centre)   Work description Metal structure delivered in "ladder" elements (~500 to). Stairs in welded composite. Wood/metal post-and-beam facades. Wood/metal windows. Aluminium sheet facade cladding. Total surface area of façade: ~4’100 m2 Vertical and horizontal aluminium connections (Lisene) (~4’205 ml). Aluminium doors. Slat blinds. Minergie P Eco and...

  Project New pedestrian bridge over the SBB tracks in Renens station   Work Description Load-bearing metal structure composed of triangulated beams, assembled in 4 sections. Length : ~120.0 m Variable width : ~10.0 à 16.0 m Clearance height : ~3.5 à 5.5 m Execution class EXC3. Partial night assembly. ~350 to   Completion 2019 - 2020   Client Communes de...

  Project New canopies and rehabilitation of the historic canopy   Work description Main steel structure with aluminium purlins, roofing in polycarbonate panels, ironwork, railings for platforms 2+3+4. Reprofiling of the historic canopy of platform 1, on-site surface treatment, replacement of the on site, replacement of the roof. Weight: ~500 tons Roof area:...

  Project New building in the sports centre   Work description S355 steel structure consisting of 5 main welded steel beams with technical openings (20 to/piece) with a length of 29.0 m and a height of 1.5 m, transported in one single piece. Profiled roof sheets. Total tonnage: ~340 tons.   Completion 2021 – 2022   Client Office fédéral...