Archive

Epalinges
  • All
  • News
  • Press
  • Sottas News
  • Uncategorized

  Project New administration building SB-A   Work description Stick curtain wall facade in natural anodised aluminium, Sottas 50 system. Cladding in 4N TZZ stainless steel sheet. Automatic sliding door and entrance lock. Cassette underside in natural anodised aluminium sheet. Coloured external venetian blinds. Total surface: ~4’300 m2   Completion 2020   Client EPIC Property Management GmbH   Main contractor HRS Real Estate SA   Architect Bonnard...

  Project New Campus (Sicpa SQ1) 4 buildings and 10 metal footbridges linking the building + facades   Work description Steel structure composed of triangulated beams with a span of 19.0 lm, fire resistance treatment R60 (~480 to). Composite floors. Gratings. Unitised aluminium facade with catwalks and external venetian blinds. Glass balustrade. Total area...

  Project Renovation of the retail, office and residential building. (Building in operation during the works)   Work description Sottas 50 aluminium stick curtain wall facade. Aluminium tilt and turn windows. Aluminium single-leaf doors. Sottas 50 aluminium stick curtain wall skylight. Light panels and strips. External venetian blinds. Total surface area of the facades: ~850 m2   Completion 2021 -...

  Project New housing and business complex (8 buildings)   Work description Steel stick curtain wall for commercial areas, entrance doors, entrance gates and garages on ground and -1 floors (~2’500 m2).   Completion 2022   Clients - Realitim (repr. Créateurs Immobilier SA) - En la Foule SA (repr. Cougar Management SA) - Copré (repr. CBRE SA)   Main contractor Steiner...

  Project New hotel   Work description Ventilated facade: invisible hook fixing and enamelled glass cladding. Aluminium stick system façade with electrochromic insulating glass. Aluminium windows with triple insulating glass and electrochromic insulating glass. Automatic revolving entrance door. Aluminium doors. Aluminium skylight over the entrance hall. Total area: ~9'200 m2 High energy performance building (HPE label).   Completion 2020 -...

  Project New administrative, logistics and storage centre   Work description Stick curtain wall system built with Sottas 50 system, to the inner courtyard. Aluminium windows and doors to ground floor and street-facing facades. Steel walkways and staircase running along the courtyard facades.   Totale surface area: ~1'900 m2   Completion 2021 – 2022   Client Qoqa + SwissRoc   Main contractor Bat-Mann...

  Project New student residence    Work description Aluminium unitised curtain wall façade.   Aluminium strick system façade.   Sandwich panel façade.   Expanded mesh cladding to fixed and folding sreens.    Glass balustrades.   Total surface area: 23,200 m2 Metal connecting footbridge between buildings   Distinction: PRIXFORIX 2024: 1st place   Completion 2019-2021   Client IHEID Institut de Hautes Etudes Internationales et du Développement   General contractor Complex Bau AG   Architects - Kengo Kuma & Associates, Tokyo (Japan) - CCHE Lausanne SA   Ingénieur 2M Ingénierie civile SA...

  Discover our video Film Zentrum Bären   Project New tower: 27’000 m2 of floor space above ground (shops, gastronomy, hotel, offices/services, housing)   Work description Tower and annex: Unitised curtain wall façade consisting of 840 nos. EI30 strongback units and 1,976 glazed or opaque infill units, including opening windows, 1,237 nos. ZIP blinds...

  Project Construction of 2 apartment buildings (Lots B+C: L4, L7)   Work description Steel/aluminium stick system façade with OPAM specifications (Ordinance on Protection against Major Accidents). Minergie-P.   Completion 2018-2020   Clients - Cooplog Point Rouge - FPLC Fondation pour la promotion du logement bon marché et de l’habitat coopératif - Fondation Nicolas Bogueret   Architects Consortium Lopes@perini - dl-c -...

  Project New football stadium (162 x 129 x 14 m)   Work description The roof of the stadium is composed of welded composite beams of variable height resting on HEM pillars embedded in the concrete walls and supported by a tie beam at the rear. The main beams are connected...