mixed Tag

  • All
  • News
  • Press
  • Sottas News
  • Uncategorized

During the night of 7 to 8 December, the 4th section of the Grand-Pont in La Chaux-de-Fonds was lifted into place over the SBB tracks. 🚆 👊 The 35-metre-long element, weighing 200 tonnes, was assembled and welded on the ground, then lifted into place in one...