  Project 14-storey building on top of the Malley-Lumière shopping centre (the 1st habitable tower in timber structure in French-speaking Switzerland)   Work description Steel structure made up of 3 lattice trusses on 3 levels (9 storeys), with a span of 46 metres. Bracing structure up to the roof on 3...

  Project New soft mobility footbridge over the A1 linking Renens station to the university campus and the lake   Work description Welded composite steel structure with a central section between supports of 35 m. The structural system consists of a single box. Execution class EXC3. Night-time assembly. Lenght of deck:...

  Project New pedestrian bridge over the SBB tracks in Renens station   Work Description Load-bearing metal structure composed of triangulated beams, assembled in 4 sections. Length : ~120.0 m Variable width : ~10.0 à 16.0 m Clearance height : ~3.5 à 5.5 m Execution class EXC3. Partial night assembly. ~350 to   Completion 2019 - 2020   Client Communes de...

  Project New canopies and rehabilitation of the historic canopy   Work description Main steel structure with aluminium purlins, roofing in polycarbonate panels, ironwork, railings for platforms 2+3+4. Reprofiling of the historic canopy of platform 1, on-site surface treatment, replacement of the on site, replacement of the roof. Weight: ~500 tons Roof area:...

  Project New building in the sports centre   Work description S355 steel structure consisting of 5 main welded steel beams with technical openings (20 to/piece) with a length of 29.0 m and a height of 1.5 m, transported in one single piece. Profiled roof sheets. Total tonnage: ~340 tons.   Completion 2021 – 2022   Client Office fédéral...

  Project New football stadium (162 x 129 x 14 m)   Work description The roof of the stadium is composed of welded composite beams of variable height resting on HEM pillars embedded in the concrete walls and supported by a tie beam at the rear. The main beams are connected...

  Project 3 new bridges and a temporary bridge for the motorway junction   Work description Bridge 1: PS JCT du Grand-Saconnex - cable-stayed bridge - Orthotropic steel deck (~1'000 tons) - Double central cable-stayed deck - Span: 80.0 m / Width: 27.4 m / Height: 37.0 m (mast) Video OFROU Bridge 2: PS de...

  Project Construction of a new multi-sports centre consisting of 2 zones: Arena" zone = ice rink. Swimming pool area = swim-  ming pools (one of which is Olympic), fencing and table tennis areas table tennis   Work description "Vaudoise arena" zone: Metal structure (~1,100 to), including a part made of triangulated...

  Project Refurbishment of Station – Soft Mobility Footbridge   Work description Steel structure with welded profiles   Length: ~190.00 m  Overall width: ~6.35 m  Execution class EXC3.  Steel guard rail  Partially installed at night  ~420 tons    The soft mobility footbridge of the Givisiez station was awarded the PRIX VELO Instrastructure prize 2020.  More information is available at the following link www.pro-velo.ch   Completion 2019   Client CFF SA - Infrastructure - I-PJ-MP-LS-PJM2 Lausanne   Engineers Groupement DMEB - DMA Ingénieurs SA -...

  Project Exterior amenities and infrastructure     Building supported on piers    Work description Steel structure  (~780 tons).  Gratings (~780 tons).    Completion 2018 - current    Client Republic and Canton of Geneva - SLRP    Site Management Groupement ADR/EDMS pa. EDMS   Architect ADR SA   Engineer EDMS SA   Extrait du Journal La Plage no 4/2019 - Portrait de notre chef-monteur Laurent Sciboz   La Plage des Eaux-Vives, son restaurant et sa Maison des...