Archive

Line 251 / Moudon and Vulliens
  • All
  • Events
  • News
  • Press
  • Private events
  • Sottas News
  • Sports events
  • Uncategorized

  Project New railway bridge   Work description Single span, two-beam composite steel and concrete bridge   Steel structure with welded profiles   Galvanizing and 3-coat paint protection  Length: ~30 linear metres   Overall width: ~3.75 m  Height of main beams: ~2.20 m  Weight: ~43 tons  Execution class: EXC4    Client CFF SA - Infrastructure – Pont et structures   Main contractor JPF SA   Engineer  GVH Tramelan SA...

  Project Temporary arena    Work description Steel structure of arena featuring 4 nos. monumental masts and a platform over the lake. (~1’200 tons)   Completion 2019   Client Confrérie des Vignerons   Architect Compagnie Finzi Pasca   Engineer Daniel Willi SA   RTS : wednesday March 20, 2019 Couleurs Locales : friday February 8, 2019...

  Project Construction of new IOC Headquarters   Work description Monumental staircases:  Construction of the supporting structure of ring-shaped staircases serving a total of 6 levels. Execution in welded composite boxes of constant width (1.50 m) with variable height (from 350 to 750 mm). External radius 12.80 m (ground floor) and 10.80...

  Project Demolition of existing bridge and construction of a new bridge    Work description In consortium: Sottas SA leading – Walo Bertschinger SA  Structure composed of three-dimensional metallic truss (made up of circular hollow section) and of reinforced concrete trough, slipping of structure up to its final location.   Execution class EXC4   (~100 tons)  Length: ~48.0 metres  Width:     ~6.0 metres  Height:    ~4.5 metres     Completion 2018   Client Compagnie du Chemin...

  Project New business high school and gymnastics hall   Work description Steel structure supporting 6 concrete floors (~250 tons), earthquake resistant, with very high execution tolerances:  - Inclined facade columns in welded sections 400 x 400 mm, thickness 40/50 mm, steel S355 and S460, length 11.5 m, weight 6.0/8.5 tons  -...

  Project Rail link CEVA (Cornavin - Eaux-Vives - Annemasse) – Lancy-Pont Rouge Station – Eaux-Vives Station  – Carouge Bachet – Chêne-Bourg Station  – Champel Hôpital Station   Work description 5 stations  Steel structure made of steel welded sections with a fixed width of 120 mm and a variable height of 300 to 3’300 mm (~3’615 to).  920 glass block modules with SGG glass (5.4 x 2.7 metres) for the façade, floor and roof with monolithic low-iron “CEVA” glass (~27’000 m2).  Works carried out in consortium.   Distinction:   IMPA...

  Project New carpark P6   Work description Steel structure of floor over 12 storeys    (~5’500 tons)    Completion 2015 - 2016   Client Flughafen Zürich AG   Architect Stutz Bolt Partner Architekten AG   Engineer Dr. Deuring + Oehninger AG  ...