Archive

Geneva
  • All
  • Events
  • News
  • Press
  • Private events
  • Sottas News
  • Sports events
  • Uncategorized

  Project Rail link CEVA (Cornavin - Eaux-Vives - Annemasse) – Lancy-Pont Rouge Station – Eaux-Vives Station  – Carouge Bachet – Chêne-Bourg Station  – Champel Hôpital Station   Work description 5 stations  Steel structure made of steel welded sections with a fixed width of 120 mm and a variable height of 300 to 3’300 mm (~3’615 to).  920 glass block modules with SGG glass (5.4 x 2.7 metres) for the façade, floor and roof with monolithic low-iron “CEVA” glass (~27’000 m2).  Works carried out in consortium.   Distinction:   IMPA...