Archive

Geneva
  • All
  • Events
  • News
  • Press
  • Private events
  • Sottas News
  • Sports events
  • Uncategorized

  Project Rail link CEVA (Cornavin - Eaux-Vives - Annemasse) – Lancy-Pont Rouge Station – Eaux-Vives Station  – Carouge Bachet – Chêne-Bourg Station  – Champel Hôpital Station   Work description 5 stations  Steel structure made of steel welded sections with a fixed width of 120 mm and a variable height of 300 to 3’300 mm (~3’615 to).  920 glass block modules with SGG glass (5.4 x 2.7 metres) for the façade, floor and roof with monolithic low-iron “CEVA” glass (~27’000 m2).  Works carried out in consortium.   Distinction:   IMPA...

  Project New carpark P6   Work description Steel structure of floor over 12 storeys    (~5’500 tons)    Completion 2015 - 2016   Client Flughafen Zürich AG   Architect Stutz Bolt Partner Architekten AG   Engineer Dr. Deuring + Oehninger AG  ...

  Project Renovation   Work description Window profiles with insulated glass (~2'000 m2).   Stick system with insulated glass (~560 m2).   Precast concrete placed in front of the insulated façade.   Automatic double sliding doors.    Completion 2016   Client Crédit Suisse AG Corporate Real Estate and Services, TLSW   Main contractor Implenia Suisse SA Buildings Ouest   Architect Burckhardt + Partner SA   Facade consultant BTM Sàrl...

  Project Assainissement du bâtiment (75 x 15 x 20 m)   Work description Facade consisting of stacked prefabricated aluminium stick system units, with transparent glazing and recessed bays.   Exterior venetian blinds.  Opaque areas faced with glazed screens with ceramic fritting.  Doors.  Glazed windows to gables and stairwells.   Entrance sas.   Awning.    Total surface area : ~2’000 m2   Completion 2016   Client Poste Immobilier Management et Services...

  Project Refurbishment of façades   Work description Dismounting of existing blinds.  New blind casings and vertical guiding profiles in aluminium.  227 nos. venetian blinds with perforated slats.   Installation of locks on existing doors and replacement of EPDM gaskets.   Works carried out during school operation.  (~2’900 m2)    Completion 2014 - 2015   Client Etat de Vaud - Service Immeubles, Patrimoine et Logistique   Site Management Tecbat...

  Project New buildings BAT A1 PPE and ADM (40.5 x 32.5 x h23.5 m)   Work description Folded metal sheet.   Window reveals in 5mm aluminium sheet, dark grey powder coating.  Stacked prefabricated units.   The joints are continuous all around the perimeter of the building to ensure proper thermal expansion of the units.  Each glazing unit forms a watertight barrier...

  Project 4 nos. buildings (school 1, extracurricular activity building, school 2 and sport facilities)    Work description Fixed windows, motorised openings and aluminium doors (~2’980 m2).  Skylight and motorised fire exhaust.  Steel stick system façade.  Glass balustrade.  EI 30 fire-rated aluminium façade to patio.    Completion 2013 -2015   Client Ville de Lancy   Architect CLR Archtitectes SA   Facade consultant Emmer Pfenninger Partner AG...

  Project Construction of a multi-purpose room and music rooms. Refurbishment of existing extracurricular activity building    Work description Double-skin façade with expanded metal (~1’780 m2).  Aluminium windows and doors, blinds. Aluminium strip windows to fitness room, blinds. Emergency staircase: 5 nos. landings + roof access. Steel handrail.   Completion 2014 - 2015   Client Ville de Genève - Service d’architecture   Architect LVPH architectes Sàrl   Facade Consultant BCS SA  ...

  Project Production centre and administration building   Completion 2013 - 2015   Work description Rooflight and stick system façade (~3'900 m2). Façades: (~35'200 m2) - liner trays + trapezoidal metal sheets - sandwich panels - stick system facade - trapezoidal metal sheets Motorised smoke extraction doors and hatches. Airlock doors, turnstiles and automatic sliding doors. Roofing: Saw-tooth roof sandwich panels...

  Project Multi-purpose centre   Work description Aluminium stick system façade (~5’400 m2). Steel structure + upper façade (~1’100 m2). Skylight (~550 m2). Fire-rated atrium (~3’100 m2). Glass balustrade.  Building certified Minergie and BREAM (BRE Environmental Assessment Method)    Completion 2014 - 2015   Client Sky Lab Real Estate AG / Concordo   Main contractor Induni & Cie SA   Architect  Bassicarella Architectes SA   Engineer BG Ingénieurs Conseils SA...