Archive

Grand-Lancy
  • All
  • Events
  • News
  • Press
  • Private events
  • Sottas News
  • Sports events
  • Uncategorized

  Project Nouveau centre associatif   Work description Steel structure in welded section and circular hollow section columns (~230 tons). Suspended ceiling in composite panels (~1'900 m2). Skylight for daylight in steel and glass. Enclosure of technical area in sandwich panels.   Completion 2015 - 2017   Client Ville de Lancy   Architect Brodbeck-Roulet architectes associés SA   Engineer BG Ingénieurs Conseils SA...

  Project Refurbishment and new building for the Swiss Cancer Research Centre   Work description Steel structure of atrium in hollow sections, tubular truss spanning 20 metres and lift shaft. Perforated metal brise-soleils (~5,500 m2). Fixed aluminium windows and fire rated windows (153 nos.). Top-hung windows (128 nos.). Superstructure. Corrugated metal sheet to façade and...

  Project New logistics centre in 3 areas   Work description Cargo & Railway hall + Services & Petrol station + Petrol warehouse: Façades made of sandwich panels (~10,410 m²), fireproof panels and corrugated metal sheet (~1,800 m²). Glazing frames made of custom-made extruded aluminium profiles. Eaves in aluminium sheeting. 3 façade openings on...

  Project 3 new rental buildings    Work description Ventilated facades (~2'200 m2) Insulation Thermally broken brackets Powder coated 2mm aluminium cassettes Glass balustrade   Completion 2016   Clients - Gerofinance SA - Monsieur François Heinzer   Main contractor Ediféa Vaud SA   Architect Pezzoli & Associés Architectes SA...

  Project Refurbishment and construction of 2 additional floors to an existing administrative building from the late 70s   Work description Additional floors: Steel structure ~60 tons (Vierendeel truss). Existing glazing: removal and disposal. Existing concrete: reinforcement to take the weight of the new façade. New façade: - Sottas 50 stick system façade (ground...

  Project Expansion stage VI   Work description Technical study (overall concept). Steel structure (~700 tons). Composite light floors (~5'700 m2). Aluminium windows, doors and blinds. Staircases. Façades in sandwich panels (~4'000 m2). Roofing: corrugated sheets and waterproofing (~4'800 m2).   Réalisation 2016 - 2017   Maître de l’ouvrage Biofruits SA   Architecte Coppey J.-Paul...

  Project Production centre and administration building   Completion 2013 - 2015   Work description Rooflight and stick system façade (~3'900 m2). Façades: (~35'200 m2) - liner trays + trapezoidal metal sheets - sandwich panels - stick system facade - trapezoidal metal sheets Motorised smoke extraction doors and hatches. Airlock doors, turnstiles and automatic sliding doors. Roofing: Saw-tooth roof sandwich panels...

  Project World headquarters administration building   Work description Lobby core cladding. Steel structure: 1’215 to. As a subcontractor of ZM Zwahlen & Mayr SA.   Completion 2012 - 2013   Client Japan Tobacco International SA   Main contractor Implenia Suisse SA   Architects - SOM Inc., London EC2A 2EW - Burckhardt + Partner SA...

  Project Housing centre   Work description Exterior facade : - insulated façade with Eternit cladding (2'900 m2) - double layered fritted glass in front of the concrete parts - sliding shutter in anodised aluminium - sunshade to the hotel façade Interior facade : 3'600 m2 - insulated façade in the corridors with Eternit artwork "Chromoscope"...

  Project New vocational training centre    Work description Steel glazing and aluminium windows (~2’800 m2)  Aluminium cladding and roofing (~5’280 m2)  Sunscreen cladding    Completion 2010 - 2011   Client Etat de Fribourg DAEC – Service des bâtiments   Main contractor HRS Hauser Rutishauser Suter SA   Architect Graber + Pulver Architekten AG   Engineers - Weber + Brönnimann AG - Emmer Pfenninger Partner AG...