Archive

Lausanne
  • All
  • Events
  • News
  • Press
  • Private events
  • Sottas News
  • Sports events
  • Uncategorized

  Project Transformation and renovation of the administration building   Work description Corridors and stairs for emergency exits in hot-galvanized metal structure, including floor with elastomastic. Installation in dense city Environnement (~125 to). Removal of 842 existing glazing. Aluminum windows. EI30 glazing. Sottas 50 aluminium stick system curtain wall. Structurally glazed screen in front...

  Project New school building (18 classrooms, double gym and APEMS schoolchildren’s centre)   Work description Metal structure delivered in "ladder" elements (~500 to). Stairs in welded composite. Wood/metal post-and-beam facades. Wood/metal windows. Aluminium sheet facade cladding. Total surface area of façade: ~4’100 m2 Vertical and horizontal aluminium connections (Lisene) (~4’205 ml). Aluminium doors. Slat blinds. Minergie P Eco and...

  Project New canopies and rehabilitation of the historic canopy   Work description Main steel structure with aluminium purlins, roofing in polycarbonate panels, ironwork, railings for platforms 2+3+4. Reprofiling of the historic canopy of platform 1, on-site surface treatment, replacement of the on site, replacement of the roof. Weight: ~500 tons Roof area:...

  Project New administration building SB-A   Work description Stick curtain wall facade in natural anodised aluminium, Sottas 50 system. Cladding in 4N TZZ stainless steel sheet. Automatic sliding door and entrance lock. Cassette underside in natural anodised aluminium sheet. Coloured external venetian blinds. Total surface: ~4’300 m2   Completion 2020   Client EPIC Property Management GmbH   Main contractor HRS Real Estate SA   Architect Bonnard...

  Project New Campus (Sicpa SQ1) 4 buildings and 10 metal footbridges linking the building + facades   Work description Steel structure composed of triangulated beams with a span of 19.0 lm, fire resistance treatment R60 (~480 to). Composite floors. Gratings. Unitised aluminium facade with catwalks and external venetian blinds. Glass balustrade. Total area...

  Project New production facility – Châtel II (160 x 85 x 18 m)   Completion 2016   Work description - Upper part: ~4'800 m2 Eternit facade, type Ondapress (tray - 160mm insulation - wood and Eternit lathing) - Lower part: ~1'965 m2 Eternit facade, type Swispearl (insulation on concrete wall - wood and Eternit lathing)   Client Swisspor Romandie SA   Main contractor Implenia...

  Project Construction of a new multi-sports centre consisting of 2 zones: Arena» zone = ice rink. Swimming pool area = swim- ming pools (one of which is Olympic), fencing and table tennis areas table tennis .   Work description Facade with single LINIT panels in front of the concrete and against...

  Project New public transport of Fribourg maintenance and operation centre   Work description Steel structure (~2,440 tons), glazed facades, windows, external facade cladding and flat roof glazing This represents 43'000 m2 of built area spread over 4 buildings   GO behind the scenes of one oft he largest construction sites in French-speakin...

  Project New "V" buildings   Work description Ventilated facade in laminated composite panels, 5 colors. Underface in laminated composite panels of triangular shape. Awnings in steel structure, roof in laminated sheet metal, underside in triangular shaped aluminium composite panels (2 x 20 m). Façade area:  ~6'000 m2   Completion 2018 – 2019   Client Urban Project SA   Architect Team Architectes JDLP   Engineers -...

  Project Extension and conversion of an industrial building into a retirement home   Work description Façade made of brushed and riveted aluminium composite panels. Unitised double-skin facade in aluminium with structurally bonded glass to the outer skin. Glass balustrades to loggias. Atrium linking ground floor to first floor: motorised sliding glass doors...